Lightweight Buildings

Modular Conservatory Walls & Base

This modular solution can provide a warm, sustainable alternative to a traditional block/brick built conservatory base/wall.

Typically installed on concrete pads the this solution saves time, mess and stress when considering a new build conservatory or single storey extension.

The GRP cladding skins come in a range of colours and offer a sustainable replication of either real brick work, stone or timber. We can even supply external boarding, immediately ready for a plasterer to render directly to.

Typically a conservatory, including this modular base/wall system, and roof, are installed in days……not weeks. No thermal bridging or moisture absorption due to our GRP lightweight, structurally sound frame work. Thermally efficient to building regulation standards.

Highly engineered, pre-fabricated modular sections, creating comfort that every part of this modular conservatory has been factory tested before delivery. This revolutionises the building market and provides homeowners with multiple benefits.

Modular Conservatory Benefits

  • Dwarf Walls, Full Walls or a Combination
  • Installed in days, not weeks
  • Save on heavy excavation work, so less mess
  • Incredible thermal efficiency
  • Building control compliant
  • Ideal for homeowners with limited to no rear property access
  • Cost effective
  • Precision engineered, pre-fabricated modular sections
  • No maintenance & authentic range of brick colour GRP clad Skins
  • Lifelike GRP timber clad skins also available
  • Ability to render onsite, creating total flexibility
  • High Thermal efficiency

Step 1 – Adjustable Feet

Floors and Walls - Scene 02 - 0000

Subject to ground conditions on where the light weight building is to be located, typically the supporting feet can be installed upon basic concrete pads. This saves on extensive ground work having to be carried out in most cases.

With adjustable capability the lightweight building feet can cater for varied floor levels, ensuring an accurate/level finish when completed

Step 2 – Base System Installation

Floors and Walls - Scene 02 - 0327

Once a sufficient membrane is laid to the covered ground area, the , lightweight solution ‘pre-manufactured’ GRP base system is installed. This includes a floor perimeter beam as well as structurally advanced supporting joists that are complemented thermally with the use of PIR insulation sheets installed in-between them.

Step 3 – Modular Wall System

Floors and Walls - Scene 02 - 0672

The benefits of the wall system is its ability to be truly modular. Each and every wall can be requested at bespoke heights and widths to suit your desired living requirement. All pre-manufactured into simple lightweight sections for ease of installation.

Step 4 – Roof Installation

Floors and Walls - Scene 02 - 0854

Once the modular system framework has been installed it is usual for an appropriate roof system to be installed.

Step 5 – Insulation

Floors and Walls - Scene 02 - 1060

High grade EPS insulation is pre-cut to size and installed neatly between the thermally efficient GRP frame work.

Step 6 – Plasterboards & Flooring

Leka - Floors & Walls - SC09 - 1417

Following any window/door installation, the internal energy efficient plasterboards are installed, along with high-grade weightrock flooring. This provides a finish ready for both plastering and preferred floor covering to be applied.

Step 7 – External Finish

Leka - Floors & Walls - SC10 - 1542

Finally the desired external finish is applied. The modular system is very diversified, offering a choice of:

  • GRP brick/timber or even stone skin finishes – all quick to install and maintenance free
  • or the unique external Leka board that allows a plasterer to apply a wet render coat directly too.

Customers can also apply their own finish if requested.

Fast Installation

Leka - Floors & Walls - SC10 - 1562

In most circumstances the modular system (including any roof system) can be installed and completed in less than a week. No more heavy ground works, mess and weeks of build time.